BAHIA PRINCIPE HOTEL PORTILLO – COLD PLATFORM EXPANSION

Project Information

Project: Phase II of cold platform expansion
Location: Bahia Principe Hotel, Portillo, Samana, Dom. Rep.
Year: 2016
Type of service: Mechanical installation, implementation of project.

Description

Installation of a New screw compressor chiller installation and distribution change of cold water and cooling system with a new cooling tower. Installed in series with the existing tower and change of its pumping system.  Entire condensation circuit insulation. Insertion of the frozen water supply pump in line. Connection of the new chiller circuit to the enlargement made in the existing collectors.